Using Hopfield to Solve Resource-Leveling Problem

05/28/2011
by   Caixing Liu, et al.
0

Although the traditional permute matrix coming along with Hopfield is able to describe many common problems, it seems to have limitation in solving more complicated problem with more constrains, like resource leveling which is actually a NP problem. This paper tries to find a better solution for it by using neural network. In order to give the neural network description of resource leveling problem, a new description method called Augmented permute matrix is proposed by expending the ability of the traditional one. An Embedded Hybrid Model combining Hopfield model and SA are put forward to improve the optimization in essence in which Hopfield servers as State Generator for the SA. The experiment results show that Augmented permute matrix is able to completely and appropriately describe the application. The energy function and hybrid model given in this study are also highly efficient in solving resource leveling problem.

READ FULL TEXT
research
05/07/2021

An Intelligent Model for Solving Manpower Scheduling Problems

The manpower scheduling problem is a critical research field in the reso...
research
04/16/2017

A Hybrid ACO Algorithm for the Next Release Problem

In this paper, we propose a Hybrid Ant Colony Optimization algorithm (HA...
research
03/28/2016

Hybrid Ant Colony Optimization in solving Multi-Skill Resource-Constrained Project Scheduling Problem

In this paper Hybrid Ant Colony Optimization (HAntCO) approach in solvin...
research
09/11/2018

Solving Sinhala Language Arithmetic Problems using Neural Networks

A methodology is presented to solve Arithmetic problems in Sinhala Langu...
research
07/05/2022

State-Augmented Learnable Algorithms for Resource Management in Wireless Networks

We consider resource management problems in multi-user wireless networks...
research
03/26/2021

Deep Two-Way Matrix Reordering for Relational Data Analysis

Matrix reordering is a task to permute the rows and columns of a given o...
research
10/12/2019

Generative Neural Network based Spectrum Sharing using Linear Sum Assignment Problems

Spectrum management and resource allocation (RA) problems are challengin...

Please sign up or login with your details

Forgot password? Click here to reset