The complexity of the Timetable-Based Railway Network Design Problem

08/01/2023
by   Nadine Friesen, et al.
0

Because of the long planning periods and their long life cycle, railway infrastructure has to be outlined long ahead. At the present, the infrastructure is designed while only little about the intended operation is known. Hence, the timetable and the operation are adjusted to the infrastructure. Since space, time and money for extension measures of railway infrastructure are limited, each modification has to be done carefully and long lasting and should be appropriate for the future unknown demand. To take this into account, we present the robust network design problem for railway infrastructure under capacity constraints and uncertain timetables. Here, we plan the required expansion measures for an uncertain long-term timetable. We show that this problem is NP-hard even when restricted to bipartite graphs and very simple timetables and present easier solvable special cases. This problem corresponds to the fixed-charge network design problem where the expansion costs are minimized such that the timetable is conductible. We model this problem by an integer linear program using time expanded networks. To incorporate the uncertainty of the future timetable, we use a scenario-based approach. We define scenarios with individual departure and arrival times and optional trains. The network is then optimized such that a given percentage of the scenarios can be operated while minimizing the expansion costs and potential penalty costs for not scheduled optional trains.

READ FULL TEXT

page 1

page 2

page 3

page 4

research
08/28/2020

Recoverable Robust Representatives Selection Problems with Discrete Budgeted Uncertainty

Recoverable robust optimization is a multi-stage approach, where it is p...
research
07/02/2019

Autonomous CPS mobility securely designed

In the last years the interconnection and ongoing development of physica...
research
11/03/2017

Cost-Optimal Operation of Energy Storage Units: Impact of Uncertainties and Robust Estimator

The rapid expansion of wind and solar energy leads to an increasing vola...
research
08/03/2023

Design Tasks and Their Complexity for Hybrid Level 3 of the European Train Control System

Railway networks have become increasingly important in recent times, esp...
research
03/09/2020

On the computational complexity of uncapacitated multi-plant lot-sizing problems

Production and inventory planning have become crucial and challenging in...
research
03/10/2023

DAG Scheduling in the BSP Model

We study the problem of scheduling an arbitrary computational DAG on a f...
research
03/26/2021

Infinity: A Scalable Infrastructure for In-Network Applications

Network programmability is an area of research both defined by its poten...

Please sign up or login with your details

Forgot password? Click here to reset