Tackling Unit Commitment and Load Dispatch Problems Considering All Constraints with Evolutionary Computation

Unit commitment and load dispatch problems are important and complex problems in power system operations that have being traditionally solved separately. In this paper, both problems are solved together without approximations or simplifications. In fact, the problem solved has a massive amount of grid-connected photovoltaic units, four pump-storage hydro plants as energy storage units and ten thermal power plants, each with its own set of operation requirements that need to be satisfied. To face such a complex constrained optimization problem an adaptive repair method is proposed. By including a given repair method itself as a parameter to be optimized, the proposed adaptive repair method avoid any bias in repair choices. Moreover, this results in a repair method that adapt to the problem and will improve together with the solution during optimization. Experiments are conducted revealing that the proposed method is capable of surpassing exact method solutions on a simplified version of the problem with approximations as well as solve the otherwise intractable complete problem without simplifications. Moreover, since the proposed approach can be applied to other problems in general and it may not be obvious how to choose the constraint handling for a certain constraint, a guideline is provided explaining the reasoning behind. Thus, this paper open further possibilities to deal with the ever changing types of generation units and other similarly complex operation/schedule optimization problems with many difficult constraints.

READ FULL TEXT

page 1

page 7

research
04/01/2015

A New Repair Operator for Multi-objective Evolutionary Algorithm in Constrained Optimization Problems

In this paper, we design a set of multi-objective constrained optimizati...
research
08/04/2019

A Repairable System Supported by Two Spare Units and Serviced by Two Types of Repairers

We study a one-unit repairable system, supported by two identical spare ...
research
08/05/2019

Repair Pipelining for Erasure-Coded Storage: Algorithms and Evaluation

We propose repair pipelining, a technique that speeds up the repair perf...
research
03/25/2022

Focused Jump-and-Repair Constraint Handling for Fixed-Parameter Tractable Graph Problems

Repair operators are often used for constraint handling in constrained c...
research
11/03/2017

Cost-Optimal Operation of Energy Storage Units: Impact of Uncertainties and Robust Estimator

The rapid expansion of wind and solar energy leads to an increasing vola...
research
02/10/2021

Heuristic Strategies for Solving Complex Interacting Stockpile Blending Problem with Chance Constraints

Heuristic algorithms have shown a good ability to solve a variety of opt...
research
02/04/2014

Scheduling a Dynamic Aircraft Repair Shop with Limited Repair Resources

We address a dynamic repair shop scheduling problem in the context of mi...

Please sign up or login with your details

Forgot password? Click here to reset