Should the Timing of Inspections be Predictable?

04/03/2023
by   Ian Ball, et al.
0

A principal hires an agent to work on a long-term project that culminates in a breakthrough or a breakdown. At each time, the agent privately chooses to work or shirk. Working increases the arrival rate of breakthroughs and decreases the arrival rate of breakdowns. To motivate the agent to work, the principal conducts costly inspections. She fires the agent if shirking is detected. We characterize the principal's optimal inspection policy. Periodic inspections are optimal if work primarily speeds up breakthroughs. Random inspections are optimal if work primarily delays breakdowns. Crucially, the agent's actions determine his risk-attitude over the timing of punishments.

READ FULL TEXT

page 1

page 2

page 3

page 4

research
02/21/2022

Selling to a principal and a budget-constrained agent

We analyze a model of selling a single object to a principal-agent pair ...
research
09/27/2022

Information Design in the Principal-Agent Problem

We study a variant of the principal-agent problem in which the principal...
research
06/09/2021

Bayesian Persuasion in Sequential Decision-Making

We study a dynamic model of Bayesian persuasion in sequential decision-m...
research
01/13/2023

A Framework for the Evaluation of Network Reliability Under Periodic Demand

In this paper, we study network reliability in relation to a periodic ti...
research
09/29/2021

Combinatorial Contracts

We introduce a new model of combinatorial contracts in which a principal...
research
06/18/2018

Delegated Search Approximates Efficient Search

There are many settings in which a principal performs a task by delegati...
research
03/10/2022

Controlling Transaction Rate in Tangle Ledger: A Principal Agent Problem Approach

Tangle is a distributed ledger technology that stores data as a directed...

Please sign up or login with your details

Forgot password? Click here to reset