NOMA in the Uplink: Delay Analysis with Imperfect CSI and Finite-Length Coding

03/22/2019
by   Sebastian Schiessl, et al.
0

We study whether using non-orthogonal multiple access (NOMA) in the uplink of a mobile network can improve the performance over orthogonal multiple access (OMA) when the system requires ultra-reliable low-latency communications (URLLC). To answer this question, we first consider an ideal system model with perfect channel state information (CSI) at the transmitter and long codewords, where we determine the optimal decoding orders when the decoder uses successive interference cancellation (SIC) and derive closed-form expressions for the optimal rate when joint decoding is used. While joint decoding performs well even under tight delay constraints, NOMA with SIC decoding often performs worse than OMA. For low-latency systems, we must also consider the impact of finite-length channel coding, as well as rate adaptation based imperfect CSI. We derive closed-form approximations for the corresponding outage or error probabilities and find that those effects create a larger performance penalty for NOMA than for OMA. Thus, NOMA with SIC decoding may often be unsuitable for URLLC.

READ FULL TEXT

page 1

page 2

page 3

page 4

research
06/05/2019

Opportunistic NOMA-based Low-Latency Uplink Transmissions

In this paper, we study the application of opportunistic non-orthogonal ...
research
06/26/2018

Delay Performance of the Multiuser MISO Downlink under Imperfect CSI and Finite Length Coding

We use stochastic network calculus to investigate the delay performance ...
research
10/19/2022

Effective Capacity of URLLC over Parallel Fading Channels with Imperfect Channel State Information

This paper investigates the effective capacity of a point-to-point ultra...
research
09/04/2019

Fundamental Tradeoffs in Uplink Grant-Free Multiple Access with Protected CSI

In the envisioned 5G, uplink grant-free multiple access will become the ...
research
07/09/2020

How URLLC can Benefit from NOMA-based Retransmissions

Among the new types of connectivity unleashed by the emerging 5G wireles...
research
06/27/2022

Adaptive Decoding Mechanisms for UAV-enabled Double-Uplink Coordinated NOMA

In this paper, we propose a novel adaptive decoding mechanism (ADM) for ...
research
08/06/2018

Stability and Throughput Analysis of Multiple Access Networks with Finite Blocklength Constraints

Motivated by the demand of ultra reliable and low latency communications...

Please sign up or login with your details

Forgot password? Click here to reset