Multi-Core Processor Scheduling with Respect to Data Bus Bandwidth

10/30/2020
by   Anton V. Eremeev, et al.
0

The paper considers the problem of scheduling software modules on a multi-core processor, taking into account the limited bandwidth of the data bus and the precedence constraints. Two problem formulations with different levels of problem-specific detail are suggested and both shown to be NP-hard. A mixed integer linear programming (MILP) model is proposed for the first problem formulation, and a greedy algorithm is developed for the second one. An experimental comparison of the results of the greedy algorithm and the MILP solutions found by CPLEX solver is carried out.

READ FULL TEXT
research
11/29/2018

A Mixed Integer Linear Programming Model for Multi-Satellite Scheduling

We address the multi-satellite scheduling problem with limited observati...
research
06/22/2021

Dominance-based linear formulation for the Anchor-Robust Project Scheduling Problem

In project scheduling under processing times uncertainty, the Anchor-Rob...
research
09/06/2019

Strong Bounds for Resource Constrained Project Scheduling: Preprocessing and Cutting Planes

Resource Constrained Project Scheduling Problems (RCPSPs) without preemp...
research
10/12/2012

A Flexible Mixed Integer Programming framework for Nurse Scheduling

In this paper, a nurse-scheduling model is developed using mixed integer...
research
12/10/2022

Walkability Optimization: Formulations, Algorithms, and a Case Study of Toronto

The concept of walkable urban development has gained increased attention...
research
09/17/2019

Network-Aware Container Scheduling in Multi-Tenant Data Center

Network management on multi-tenant container-based data centers has crit...
research
07/04/2022

Satellite downlink scheduling under breakpoint resume mode

A novel problem called satellite downlink scheduling problem (SDSP) unde...

Please sign up or login with your details

Forgot password? Click here to reset