Integrated Cutting and Packing Heterogeneous Precast Beams Multiperiod Production Planning Problem

08/25/2020
by   Kennedy Araujo, et al.
0

We introduce a novel variant of cutting production planning problems named Integrated Cutting and Packing Heterogeneous Precast Beams Multiperiod Production Planning (ICP-HPBMPP). We propose an integer linear programming model for the ICP-HPBMPP, as well as a lower bound for its optimal objective function value, which is empirically shown to be closer to the optimal solution value than the bound obtained from the linear relaxation of the model. We also propose a genetic algorithm approach for the ICP-HPBMPP as an alternative solution method. We discuss computational experiments and propose a parameterization for the genetic algorithm using D-optimal experimental design. We observe good performance of the exact approach when solving small-sized instances, although there are difficulties in finding optimal solutions for medium and large-sized problems, or even in finding feasible solutions for large instances. On the other hand, the genetic algorithm could find good-quality solutions for large-sized instances within short computing times.

READ FULL TEXT

page 1

page 2

page 3

page 4

research
08/06/2015

The study of cuckoo optimization algorithm for production planning problem

Constrained Nonlinear programming problems are hard problems, and one of...
research
07/18/2019

Finding First and Most-Beautiful Queens by Integer Programming

The n-queens puzzle is a well-known combinatorial problem that requires ...
research
04/26/2015

When Hillclimbers Beat Genetic Algorithms in Multimodal Optimization

It has been shown in the past that a multistart hillclimbing strategy co...
research
10/08/2021

GEO satellites on-orbit repairing mission planning with mission deadline constraint using a large neighborhood search-genetic algorithm

This paper proposed a novel large neighborhood search-adaptive genetic a...
research
10/11/2017

A batching and scheduling optimisation for a cutting work-center: Acta-Mobilier case study

The purpose of this study is to investigate an approach to group lots in...
research
06/15/2020

Exact and Metaheuristic Approaches for the Production Leveling Problem

In this paper we introduce a new problem in the field of production plan...
research
08/28/2012

Soft Computing approaches on the Bandwidth Problem

The Matrix Bandwidth Minimization Problem (MBMP) seeks for a simultaneou...

Please sign up or login with your details

Forgot password? Click here to reset