Fuzzy Mixed Integer Linear Programming for Air Vehicles Operations Optimization

03/13/2015
by   Arindam Chaudhuri, et al.
0

Multiple Air Vehicles (AVs) to prosecute geographically dispersed targets is an important optimization problem. Associated multiple tasks viz., target classification, attack and verification are successively performed on each target. The optimal minimum time performance of these tasks requires cooperation among vehicles such that critical time constraints are satisfied i.e. target must be classified before it can be attacked and AV is sent to target area to verify its destruction after target has been attacked. Here, optimal task scheduling problem from Indian Air Force is formulated as Fuzzy Mixed Integer Linear Programming (FMILP) problem. The solution assigns all tasks to vehicles and performs scheduling in an optimal manner including scheduled staged departure times. Coupled tasks involving time and task order constraints are addressed. When AVs have sufficient endurance, existence of optimal solution is guaranteed. The solution developed can serve as an effective heuristic for different categories of AV optimization problems.

READ FULL TEXT

page 1

page 2

page 3

page 4

research
11/29/2018

A Mixed Integer Linear Programming Model for Multi-Satellite Scheduling

We address the multi-satellite scheduling problem with limited observati...
research
01/25/2020

Vehicle Scheduling Problem

We define a new problem called the Vehicle Scheduling Problem (VSP). The...
research
12/08/2016

Safety Verification and Control for Collision Avoidance at Road Intersections

This paper presents the design of a supervisory algorithm that monitors ...
research
02/25/2020

Algorithms for Optimizing Fleet Scheduling of Air Ambulances

Proper scheduling of air assets can be the difference between life and d...
research
10/05/2018

Multi-Vehicle Trajectory Optimisation On Road Networks

This paper addresses the problem of planning time-optimal trajectories f...
research
05/04/2017

Tramp Ship Scheduling Problem with Berth Allocation Considerations and Time-dependent Constraints

This work presents a model for the Tramp Ship Scheduling problem includi...
research
02/11/2020

Rapid Top-Down Synthesis of Large-Scale IoT Networks

Advances in optimization and constraint satisfaction techniques, togethe...

Please sign up or login with your details

Forgot password? Click here to reset