Delay Analysis of Base Station Flow Table in SDN-enabled Radio Access Networks

06/12/2021
by   Seyed Hamed Rastegar, et al.
0

Future generation wireless networks are designed with extremely low delay requirements which makes even small contributed delays important. On the other hand, software defined networking (SDN) has been introduced as a key enabler of future wireless and cellular networks in order to make them more flexible. In SDN, a central controller manages all network equipments by setting the match-action pairs in flow tables of the devices. However, these flow tables have limited capacity and thus are not capable of storing the rules of all the users. In this paper, we consider an SDN-enabled base station (SD-BS) in a cell equipped with a limited capacity flow table. We analyze the expected delay incurred in processing of the incoming packets to the SD-BS and present a mathematical expression for it in terms of density of the users and cell area.

READ FULL TEXT

page 1

page 2

page 3

research
10/27/2017

Fronthaul-Aware Software-Defined Wireless Networks: Resource Allocation and User Scheduling

Software-defined networking (SDN) provides an agile and programmable way...
research
12/26/2017

Matching model of flow table for networked big data

Networking for big data has to be intelligent because it will adjust dat...
research
12/05/2018

A Brief History on the Theoretical Analysis of Dense Small Cell Wireless Networks

This article provides dives into the fundamentals of dense and ultra-den...
research
09/17/2021

An Optimization-based Approach for Flow Table Capacity Bottleneck Mitigation in Software-Defined Networks

Flow delegation is a flexible technique to mitigate flow table capacity ...
research
08/29/2018

Enabling Ultra-Low Delay Teleorchestras using Software Defined Networking

Ultra-low delay sensitive applications can afford delay only at the leve...
research
01/14/2019

SDN-enabled MIMO Heterogeneous Cooperative Networks with Flexible Cell Association

Small-cell densification is a strategy enabling the offloading of users ...
research
10/07/2021

What Should Future Wireless Network Architectures Be?

The accelerated convergence of digital and real-world lifestyles has imp...

Please sign up or login with your details

Forgot password? Click here to reset