Delay Analysis in Full-Duplex Heterogeneous Cellular Networks

07/25/2019
by   Leila Marandi, et al.
0

Heterogeneous networks (HetNets) as a combination of macro cells and small cells are used to increase the cellular network's capacity, and present a perfect solution for high-speed communications. Increasing area spectrum efficiency and capacity of HetNets largely depends on the high speed of backhaul links. One effective way which is currently utilized in HetNets is the use of full-duplex (FD) technology that potentially doubles the spectral efficiency without the need for additional spectrum. On the other hand, one of the most critical network design requirements is delay, which is a key representation of the quality of service (QoS) in modern cellular networks. In this paper, by utilizing tools from the stochastic geometry, we analyze the local delay for downlink (DL) channel, which is typically defined as the mean number of required time slots for a successful communication. Given imperfect self-interference (SI) cancellation in practical FD communications, we utilize duplex mode (half-duplex (HD) or FD) for each user based on the distance from its serving base station (BS). Further, we aim to investigate the energy efficiency (EE) for both duplexing modes, i.e., HD and FD, by considering local delay. We conduct extensive simulations to validate system performance in terms of local delay versus different system key parameters.

READ FULL TEXT
research
04/19/2018

QoS Provisioning in Large Wireless Networks

Quality of service (QoS) provisioning in next-generation mobile communic...
research
01/28/2018

Study on Energy Consumption and Coverage of Hierarchical Cooperation of Small Cell Base Stations in Heterogeneous Networks

The demand for communication services in the era of intelligent terminal...
research
10/21/2020

Full-Duplex and Dynamic-TDD: Pushing the Limits of Spectrum Reuse in Multi-Cell Communications

Although in cellular networks full-duplex and dynamic time-division dupl...
research
01/03/2018

Joint Uplink and Downlink Resource Configuration for Ultra-reliable and Low-latency Communications

Supporting ultra-reliable and low-latency communications (URLLC) is one ...
research
09/09/2018

Large-Scale Spectrum Allocation for Cellular Networks via Sparse Optimization

This paper studies joint spectrum allocation and user association in lar...
research
02/08/2018

Resource Allocation in Heterogenous Full-duplex OFDMA Networks: Design and Analysis

Recent studies indicate the feasibility of full-duplex (FD) bidirectiona...
research
03/01/2018

SIR Meta Distribution of K-Tier Downlink Heterogeneous Cellular Networks with Cell Range Expansion

Heterogeneous cellular networks (HCNs) constitute a necessary step in th...

Please sign up or login with your details

Forgot password? Click here to reset