Combining Monte-Carlo and Hyper-heuristic methods for the Multi-mode Resource-constrained Multi-project Scheduling Problem

11/13/2015
by   Shahriar Asta, et al.
0

Multi-mode resource and precedence-constrained project scheduling is a well-known challenging real-world optimisation problem. An important variant of the problem requires scheduling of activities for multiple projects considering availability of local and global resources while respecting a range of constraints. A critical aspect of the benchmarks addressed in this paper is that the primary objective is to minimise the sum of the project completion times, with the usual makespan minimisation as a secondary objective. We observe that this leads to an expected different overall structure of good solutions and discuss the effects this has on the algorithm design. This paper presents a carefully designed hybrid of Monte-Carlo tree search, novel neighbourhood moves, memetic algorithms, and hyper-heuristic methods. The implementation is also engineered to increase the speed with which iterations are performed, and to exploit the computing power of multicore machines. Empirical evaluation shows that the resulting information-sharing multi-component algorithm significantly outperforms other solvers on a set of "hidden" instances, i.e. instances not available at the algorithm design phase.

READ FULL TEXT

page 1

page 2

page 3

page 4

research
10/20/2022

An Efficient Merge Search Matheuristic for Maximising the Net Present Value of Project Schedules

Resource constrained project scheduling is an important combinatorial op...
research
03/28/2016

Hybrid Ant Colony Optimization in solving Multi-Skill Resource-Constrained Project Scheduling Problem

In this paper Hybrid Ant Colony Optimization (HAntCO) approach in solvin...
research
07/05/2022

Empirical Evaluation of Project Scheduling Algorithms for Maximization of the Net Present Value

This paper presents an empirical performance analysis of three project s...
research
03/14/2022

A faster exact method for solving the robust multi-mode resource-constrained project scheduling problem

This paper presents a mixed-integer linear programming formulation for t...
research
04/24/2022

MAP-Elites based Hyper-Heuristic for the Resource Constrained Project Scheduling Problem

The resource constrained project scheduling problem (RCPSP) is an NP-Har...
research
01/11/2023

Continuous-Time Formulations for Multi-Mode Project Scheduling

This paper reviews compact continuous-time formulations for the multi-mo...
research
10/31/2022

Adaptive Population-based Simulated Annealing for Uncertain Resource Constrained Job Scheduling

Transporting ore from mines to ports is of significant interest in minin...

Please sign up or login with your details

Forgot password? Click here to reset