Automating Bird Diverter Installation through Multi-Aerial Robots and Signal Temporal Logic Specifications

09/19/2023
by   Alvaro Caballero, et al.
0

This paper tackles the task assignment and trajectory generation problem for bird diverter installation using a fleet of multi-rotors. The proposed motion planner considers payload capacity, recharging constraints, and utilizes Signal Temporal Logic (STL) specifications for encoding mission objectives and temporal requirements. An event-based replanning strategy is introduced to handle unexpected failures and ensure operational continuity. An energy minimization term is also employed to implicitly save multi-rotor flight time during installation. Simulations in MATLAB and Gazebo, as well as field experiments, demonstrate the effectiveness and validity of the approach in a mock-up scenario.

READ FULL TEXT

page 1

page 2

research
10/18/2022

A Signal Temporal Logic Motion Planner for Bird Diverter Installation Tasks with Multi-Robot Aerial Systems

This paper investigates the problem of task assignment and trajectory ge...
research
02/09/2023

Power Line Inspection Tasks with Multi-Aerial Robot Systems via Signal Temporal Logic Specifications

A framework for computing feasible and constrained trajectories for a fl...
research
06/04/2023

Ergonomic Collaboration between Humans and Robots: An Energy-Aware Signal Temporal Logic Perspective

This paper presents a method for designing energy-aware collaboration ta...
research
03/31/2023

Online Modifications for Event-based Signal Temporal Logic Specifications

In this paper we present a grammar and control synthesis framework for o...
research
06/16/2023

A Signal Temporal Logic Planner for Ergonomic Human-Robot Collaboration

This paper proposes a method for designing human-robot collaboration tas...
research
09/30/2020

Co-design of Control and Planning for Multi-rotor UAVs with Signal Temporal Logic Specifications

Urban Air Mobility (UAM), or the scenario where multiple manned and Unma...
research
03/04/2021

A framework for power line inspection tasks with multi-robot systems from signal temporal logic specifications

Inspection of power line infrastructures must be periodically conducted ...

Please sign up or login with your details

Forgot password? Click here to reset