A Novel Approach for the Process Planning and Scheduling Problem Using the Concept of Maximum Weighted Independent Set

08/05/2020
by   Kai Sun, et al.
0

Process Planning and Scheduling (PPS) is an essential and practical topic but a very intractable problem in manufacturing systems. Many research use iterative methods to solve such problems; however, they cannot achieve satisfactory results in both quality and computational speed. Other studies formulate scheduling problems as a graph coloring problem (GCP) or its extensions, but these formulations are limited to certain types of scheduling problems. In this paper, we propose a novel approach to formulate a general type of the PPS problem with resource allocation and process planning integrated towards a typical objective, minimizing the makespan. The PPS problem is formulated into an undirected weighted conflicting graph, where nodes represent operations and their resources; edges represent constraints, and weight factors are guidelines for the node selection at each time slot. Then, the Maximum Weighted Independent Set (MWIS) problem can be solved to find the best set of operations with their desired resources for each discrete time slot. This proposed approach solves the PPS problem directly with minimum iterations. We establish that the proposed approach always returns a feasible optimum or near-optimum solution to the PPS problem. The different weight configurations of the proposed approach for solving the PPS problem are tested on a real-world PPS example and further designated test instances to evaluate the scalability, accuracy, and robustness.

READ FULL TEXT

page 7

page 22

page 34

page 36

page 42

research
08/05/2020

An Algorithm Framework for the Exact Solution and Improved Approximation of the Maximum Weighted Independent Set Problem

The Maximum Weighted Independent Set (MWIS) problem, which considers a g...
research
12/11/2022

A Hierarchical Temporal Planning-Based Approach for Dynamic Hoist Scheduling Problems

Hoist scheduling has become a bottleneck in electroplating industry appl...
research
03/10/2020

Coexistence Mechanism between eMBB and uRLLC in 5G Wireless Networks

uRLLC and eMBB are two influential services of the emerging 5G cellular ...
research
11/13/2019

Radio Resource Allocation in 5G New Radio: A Neural Networks Based Approach)

The minimum frequency-time unit that can be allocated to User Equipments...
research
01/21/2022

A Matheuristic Approach for Solving a Simultaneous Lot Sizing and Scheduling Problem with Client Prioritization in Tire Industry

This paper introduces an integrated lot sizing and scheduling problem in...
research
07/10/2019

Data-driven Policy on Feasibility Determination for the Train Shunting Problem

Parking, matching, scheduling, and routing are common problems in train ...

Please sign up or login with your details

Forgot password? Click here to reset